Francis Turbine, Mixed Flow Hydro Turbine Generator for Hydro Power Generation

Get reliable Francis Turbine and Mixed Flow Hydro Turbine Generator for hydro power generation at our factory. High-quality products for sustainable energy.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
Various
Standard
Standard
Head
50 to 170m
Range of Supply
Turbine-Generator Set and Parts
Maintenance
Available Upon Request
Commissioning
Available Upon Request
Period of Warranty
3 Years
Transport Package
in Bulk
Trademark
Runh
Origin
Shandong Province
Production Capacity
500 Units Per Year

Product Description

Francis Turbine, as the most commonly used turbine in hydro power generation, has following technical features, compared with other models of hydro turbine.

1. Compact structure: the structure of Francis turbine is both compact and simple, including volute, ring socket, water distributor, capping, runner and so on. 

2. Wide range of water head: the applicable head ranges from 20 meters to 700 meters.(the head in application generally falls between 50 to 400 meters in practice. )

3. Wide range of output power : it ranges from tens of kilowatt to hundreds of thousand kilowatts. (the maximum output of Francis turbine has exceeded 700.000 kilowatt)

4. Minimum maintenance cost: the pump plate is non-contact sealed, which doesn't require regular changing of cooling water and lubricant, thus ensures extraordinarily long service life.


Scope of supply of Runh Power: Hydro-turbine and generator unit.

Francis Turbine, Mixed Flow Hydro Turbine Generator for Hydro Power Generation

Technical parameters of Francis turbine provided by Runh Power:

1.Head: 260 to 725 meters (turbine with head higher than 725 meters can be customize-made)
2.Flow: no more than 2.03 m3/s 
3.Capacity of generator : 20 to 6300 KV
4.Output of the unit :18.0 to 5585 KW

Following is a table of parameter of part of Runh Power's Francis turbine: 
(Complete catalog of inclined jet turbine is available upon your request.)
model turbine generator governor valve
head
(m)
Flow
(m3/s)
Output (kv) speed (r/min) model capacity(kW)
HLD54-WJ-42 38.6 0.27 83 1000 SFW75-6/493 75 SDT Φ400
46.8 0.32 119 SFW100-6/560 100
51.9 0.34 138 SFW125-6/560 125
62.5 0.38 180 SFW160-6/650 160
HLD54-WJ-50 36 0.38 111 750 SFW100-8/560 100 SDT BWT-3000 Φ600
41.7 0.42 140 SFW125-8/650 125
49.6 0.45 181 SFW160-8/650 160
57 0.49 223 1000 SFW200-6/650 200
66 0.52 280 SFW250-6/740 250
77 0.57 350 SFW320-6/740 320
89.7 0.61 400 SFW400-6/850 400
104 0.66 550 SFW500-6/860 500
HLD54-WJ-60 51.2 0.68 283 750 SFW250-8/740 250 BWT-3000 Φ600
59.4 0.74 353 SFW320-8/850 320
70.3 0.82 455 SFW400-8/850 400
81.2 0.85 562 1000 SFW500-6/850 500
94.0 0.92 701 SFW630-6/990 630
108.0 1.01 872 SFW800-6/993 800
127.5 1.12 1109 SFW1000-6/1180 1000
148.4 1.22 1367 SFW1250-6/1180 1250


Francis Turbine, Mixed Flow Hydro Turbine Generator for Hydro Power Generation


Runh Power's focus of business in the EPC service of power plant. For commissioning Runh Power a project of power plant, following documents are required for the approval of investment made to foreign countries. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from various Chiness national bank. 

-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

Francis Turbine, Mixed Flow Hydro Turbine Generator for Hydro Power Generation


Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Copy and paste superlinks below to your browser to view more products&services of Runh Power:

Integraed Turbine Island:
http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html

Condensing Steam Turbine http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html

Condensing & Extracting Steam Turbine:  http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html

Complete catalog of Runh Power's service and products http://runhpower.en.made-in-china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html


Francis Turbine, Mixed Flow Hydro Turbine Generator for Hydro Power Generation

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours